Maple Leaf Drilling Projects

 
  • Geotechnical DrillingSpecialty Drilling

  • AECL

  • One of many projects Maple Leaf Drilling has successfully completed for AECL was to install large 8” standpipes beside radioactive concrete cylinders. The objective was to run a specially made x-ray machine on either side of the standpipes to discover what radioactive materials have been locked away in the concrete cylinders. We chose the VL-60 drill to perform this project because of its long reach and limited access capabilities, which made it the perfect fit for this job.

    Long Reach Drilling
    VL60 Drill
    Specialty Drilling