Maple Leaf Drilling Projects

Indoor DrillingIndoor Drilling

Winnipeg Airport

Maple Leaf Drilling was given the large task of building a drill rig that could work inside a building without giving off any emissions inside. The large scope project was for drilling inside the new Winnipeg airport which was being built as LEED certified and could not have a engine running inside the building. The B-20E works by having a 37 kW generator running outside while running a commercial extension cord to the drill which powers the hydraulic drills electric motor. With the success of this first project word spread of our very capable “inside” drill rig and since we have preformed multiply environmental and geotechnical investigations effectively and on budget.