Maple Leaf Drilling Projects

Geotechnical DrillingEnvironmental Drilling

North Ontario Fly-In Access Tour

Maple Leaf Drilling preformed a large scope environmental drilling project in North Western Ontario that spanned 5 months. The job was performed by our B-20L drill rig using Hollow Stem, Solid Stem, SPT, Diamond Drilling, ODEX, and Air Hammer methods. The project presented many challenges from site access, soil stratigraphy, remote locations, and preparedness but we conquered them all.

 

Stonewall

Maple Leaf Drilling completed a large scope environmental drilling project that included installing 15 deep bedrock wells using the combination of hollow stem auger, Odex, and DTH. Every hole was drilled, sampled, and installed successfully using our Acker Renegade. Keeping safe is always a priority at Maple Leaf Drilling and this job was no different. Every safety measure was taken and the job was completed under budget.
Environmental Drilling
Environmental - Acker Renegade
Acker Renegade
Northern Drilling